trace aboms.md

For the complete documentation index, see llms.txt. Markdown versions of documentation pages are available by appending .md to page URLs; this page is available as Markdown.

As-built Bill of Materials (aBOM)

{% embed url="https://www.loom.com/share/57c6458d50444bceb42c1a69b5b5c3c4?sid=3ab5c0c2-3cc9-4cc7-9078-9c28847a0a2d" %}

Overview

IONs aBOM is a powerful tool that allows you to keep track of which parts, down the serial or lot number, were used in higher-level assemblies, across multiple levels of assemblies. The aBOM is a living and real-time document, meaning that changes are reflected instantaneously as parts are installed or uninstalled.

An aBOM is a tree-like scaffolding that connects parent and children inventory. Each node is an inventory item (see: Inventory), whether serial-tracked, lot-tracked, or untracked.

The aBOM can be accessed from either runs associated to the assembly, or from the inventory screen as seen below.

Why is it valuable

The aBOM is a massively valuable dataset within the factory. The traceability allows for:

Getting into the details

The aBOM follows the requirement and fulfillment model like other parts of ION (for instance, kits). Parent inventories have build requirements that define:

Inventories get installed into build requirements via aBOM installations. The aBOM installation tracks:

When an inventory is uninstalled, all of its children travel with it. This means that the data for the entire assembly moves with the inventory to match the physical reality.

If the Build Requirement quantity is set to 0, a tool tip is displayed informing the operator that the quantity is optional

aBOM construction

You can install into the aBOM as seen in from the run execution screen. From here, you can start adding parts to your aBOM, and even use the "Install from Kit" button to install all the same lot numbers and serial numbers from the kit associated with the run. You can also add parts to the aBOM at the time of execution if needed.

After installing your parts, the build aBOM changes to Build aBOM (100%) to show that you have installed all of the parts for the run. Build requirements that do not have a quantity greater than 0 do not count towards the final aBOM build percentage.

Substitutes

On the aBOM, substitutes will appear with the "double arrow" icon shown below.

Here is how they will display within the aBOM interface:

  1. The icon indicates that a substitute can be used to fulfill the requirement
  2. Expanding the requirement will display the part numbers for the acceptable substitutes
  3. When a substitute is installed, the icon will appear next to the installed part

Visualizing aBOMs

Even while an aBOM is being constructed, you can visualize the parts that make up the part you are interested in by going to Parts > Trace. From here, you can search for a part, which will then load the in-progress or complete aBOM for that specific part. We support a tree view and an indented table view of the aBOM.

The indented aBOM table shows inventory in white rows and build requirements in slate colored rows.

Modifying an aBOM

Simply create a new run for the top-level assembly that you are affecting. For example, if you are changing the engine controller on the following BOM:

Create a run with the part number and serial number for the engine. Include a procedure with the instructions for changing the engine controller. This will allow the operator to remove the old engine controller and install a new one, by serial (or lot) number. The resulting aBOM will be updated for all levels up the vehicle's aBOM.

Permissions

Modifying the requirements of an aBOM has different permissions than installing/uninstalling.

Here is the mapping of permissions to those actions:

Uninstalling a part that is shared across lots

The behavior above — where children travel with an inventory on uninstall to match physical reality — describes a part that belongs to a single assembly. There is one case that behaves differently: a part that has become shared across multiple lots.

When a lot is split on a run (see Split Inventory on a Run), parts that were already installed before the split cannot be confidently assigned to one resulting lot or the other. ION keeps a single aBOM installation record and links it to every resulting lot, so the part shows as installed on all of the lots that share it. This preserves the original traceability without inventing quantities that were never there.

Because that one installation is shared, uninstalling it removes it from every lot that shares it — not only the lot you are viewing. The historical genealogy is not lost; rather, the change propagates to the sibling lots. ION flags this before you confirm:

{% hint style="info" %} Installing into, or editing the quantity of, a shared build requirement is also reflected on every lot that shares it. Only uninstall asks you to confirm first, because it is the change most likely to affect a sibling lot you did not mean to touch. {% endhint %}

Full per-lot divergence of a shared installation is a separate enhancement that is in progress. Until then, sharing is how ION keeps every lot's traceability accurate after a split.

Sharing Installations Amongst Parent Assemblies

See Split Inventory on a Run for more details.