Split or clone an issue - ION Manual

Clone vs Split

The difference is what happens to the inventory on the original issue when you assign it:

Choose between the two with the assign control in step 4.

Create the new issues

  1. On the issue, open the More options menu and select Clone / Split to open the Split into Detail Tickets dialog. It has two areas: Associate Inventory for picking parts, and Detail Tickets for the new issues.
  2. Click Add Ticket for each new issue you want. For each one, set a Title, a Disposition Type, Disposition Notes, and an assignee.
  3. In Associate Inventory, select the parts for the new issue. For a lot-tracked part, adjust the quantity to assign.
  4. Assign the selected inventory using one of:
    • Assign to Ticket to clone it (keep it on the original issue).
    • Remove & Assign to split it (move it off the original issue).
  5. Optional: use Copy Settings to choose which fields carry over from the original issue to the new issues.
  6. Click Create Issues.

Each new issue links back to the original under Related Issues.

The Split into Detail Tickets dialog, with the Associate Inventory and Detail Tickets areas.

Link related issues

Splitting or cloning links the new issues automatically, but you can link any existing issue by hand.

  1. On the issue, find the Related Issues section.
  2. Click Add Related Issue and select the issue to link.

To unlink a related issue, click the remove control on that issue in the Related Issues section.