Edit part policies in a plan - ION Manual

Set the plan-wide defaults

The Planning assumptions card holds the default policy every part starts from. Each numeric field saves when you leave it.

Field Effect on the plan
Spare quantity Adds that many units to every net requirement.
Minimum stock Floors the requirement so that many units stay on hand.
Yield rate (%) The expected good-output rate assumed when sizing requirements.
Attrition rate (%) Inflates buy quantities to cover expected scrap.
Buffer lead days Extra schedule buffer on top of each part’s lead time.
Order offset days Adjusts order timing by that many days.
Period of supply (weeks) Consolidates that many weeks of demand into one order.
Minimum batch quantity Rounds each order up to the next multiple of this quantity.

The Lead-time strategy selector controls where lead times come from. Category defaults uses standard lead times per part category, and Manual / CSV uses values you supply. Strategies based on procedure steps and historical runs appear in the list but are unavailable until that data exists.

Review each part’s resolved policy

The Per-part policy panel lists every part in the plan’s bill of materials with the policy that applies to it. For each part you see:

These per-part numbers are previews. The authoritative quantities and dates come from running the plan.

Edit policies per part via CSV

Per-part overrides are edited in bulk through a CSV round trip:

  1. In the Per-part policy panel, click Download CSV. The template lists every part with its current category-prefilled values.
  2. Edit the values you want to override. A field you leave blank keeps the plan default for that part.
  3. Click Upload CSV and select the edited file. The panel updates each part’s resolved policy and marks the uploaded values’ provenance.

Correct a part’s make or buy classification

A related per-part setting lives on the Components tab: each part’s Make / Buy value, which decides whether Autoplan proposes a purchase order ( Buy) or a run ( Make) for its shortfall. Change it from the dropdown on the part’s row; the plan re-derives immediately.