The aBOM tab in Build Readiness shows the installation status of every part in your as-built BOMs, with cost rollups and issue counts per component. Each row is one required part within one top-level serialized assembly. To open the dashboard, go to Analytics > Build Readiness > aBOM.
Filters
Part Number: narrows all KPIs, charts, and table rows to a single top-level assembly part number. Selecting a part number resets the Rev and Serial filters.
Rev: further narrows to a single revision of the selected assembly. Resets the Serial filter.
Serial: further narrows to a single serialized instance of the selected assembly.
Hide root nodes: when enabled, hides the row where the part is the top-level assembly itself, so the table shows only child components.
Sub-tabs
The aBOM tab contains two sub-tabs sharing the same filters:
- aBOM: the full installation detail table with cost and linkage columns.
- Issues: filtered to only rows that have at least one issue, with the same column set.
KPI cards
| Card | What it shows |
|---|---|
| Total Cost | Sum of TOTAL_COST across all rows in the current filter. |
| Total Parts | Number of distinct top-level assembly instances in the current filter. |
| Fully Installed | Number of assembly instances where IS_FULLY_INSTALLED is true, and the percentage of the total. |
| Open Issues | Sum of OPEN_ISSUE_COUNT across all rows. |
The Issues sub-tab shows two additional cards: Open Issues and Total Issues for the filtered set.
Table columns
| Column | Export field | Description |
|---|---|---|
| Top Level Part | TOP_LEVEL_PART_NUMBER |
The part number of the top-level serialized assembly this row belongs to. |
| Top Level Rev | TOP_LEVEL_REVISION |
The revision of the top-level assembly. |
| Top Level SN | TOP_LEVEL_SERIAL_NUMBER |
The serial number of the top-level assembly instance. |
| Top Level Status | TOP_LEVEL_STATUS |
The inventory status of the top-level assembly (the same status values used across ION inventory). |
| Level | MIN_LEVEL |
The BOM level of this component (0 = the top-level assembly itself). |
| Parents | PARENTS |
The parent assemblies of this component in the aBOM hierarchy. Expand the cell to see each parent’s part number, revision, trace, level, and path. |
| Required Part | REQUIRED_PART |
The part number required at this position in the aBOM. |
| Required Rev | REQUIRED_PART_REVISION |
The revision of the required part as specified in the aBOM. |
| Sourcing | SOURCING_STRATEGY |
How the part is sourced: buy (purchased) or make (manufactured in-house). |
| Installed Part | INSTALLED_PART |
The part number of the inventory unit that was actually installed. |
| Installed Rev | INSTALLED_PART_REVISION |
The revision of the installed part. |
| Installed Trace | INSTALLED_PART_TRACE |
The serial or lot number of the installed inventory unit. |
| Req Qty | TOTAL_REQ_QUANTITY |
The total quantity required at this BOM position. |
| Installed Qty | INSTALLED_QUANTITY |
The quantity that has been installed. |
| Installed | IS_FULLY_INSTALLED |
Whether the required quantity at this position has been fully installed. |
| BOM Cost | PART_COST |
The cost of this part as defined in the part library. |
| Unit Cost | UNIT_COST |
The cost recorded on the part inventory line. |
| Avg Cost | AVG_COST |
The average cost of this part across purchase orders. |
| Total Cost | TOTAL_COST |
The total cost for this row, based on the installed quantity and unit cost. |
| Open Issues | OPEN_ISSUE_COUNT |
The number of open issues linked to this component. |
| Total Issues | TOTAL_ISSUE_COUNT |
The total number of issues linked to this component, including closed ones. |
| Linked Runs | LINKED_RUNS |
Runs associated with this component. Expand the cell to see run ID, status, and due date. |
| Linked POs | LINKED_POS |
Purchase order lines associated with this component. Expand the cell to see PO number, position, quantity, cost, line status, PO status, and estimated arrival. |
| Installed At | INSTALLED_TIME |
The timestamp when this component was installed. |
Export
The aBOM sub-tab and the Issues sub-tab each have their own export. Click Export in the table toolbar to download the current view as a CSV. Both exports respect all active filters; the Issues export additionally filters to rows with at least one issue.